2017​


                      PORT                 STBD                           GEN             
Finish Hrs     1909.6                1969.0                         10275.0              
Start Hrs       1903.6                1963.0                         10261.5         
Used                 6                          6                               13.5

**Rick's Managers Work Trip**
Dates: June 15- June 17
While on board I did 2 days of cleaning & repair work.
Forward Deck power washed
AFT deck power washed
Upper deck scrubbed & power washed
Stove Cleaned
Swim platform power washed
Bathroom & Hold(4 total) battery & canisters replaced
Kitchen faucet repaired
MMC Solenoid replaced. AP to be replacing solenoid with reset breaker
All windows washed & deep clean done

Needs to be fixed or replaced:
Forward deck STBD hatch ripped from hinge. AP to replace hinge & reinstall hatch.




Engines and Generators: 

110 V and 12 V System: 

Problems Inside Boat

Problems Outside the Boat

Wish List: 

Water Therapy Check On/Off Sheet Received: 

Pre- Trip: - 

Post Trip: -  




  *NEW* Check ON/OFF List
We are only noting what is different/doesn’t add up…



Water Therapy Propeller Inventory:

                            Boarding:                         Returning:
#1 Port            
 Port Skeg        
#1 Starboard   
Starboard Skeg  
#2 Port              
#2 Starboard      
#3  Port              
#3 Starboard