2017
PORT STBD GEN
Finish Hrs 1909.6 1969.0 10275.0
Start Hrs 1903.6 1963.0 10261.5
Used 6 6 13.5
**Rick's Managers Work Trip**
Dates: June 15- June 17
While on board I did 2 days of cleaning & repair work.
Forward Deck power washed
AFT deck power washed
Upper deck scrubbed & power washed
Stove Cleaned
Swim platform power washed
Bathroom & Hold(4 total) battery & canisters replaced
Kitchen faucet repaired
MMC Solenoid replaced. AP to be replacing solenoid with reset breaker
All windows washed & deep clean done
Needs to be fixed or replaced:
Forward deck STBD hatch ripped from hinge. AP to replace hinge & reinstall hatch.
Engines and Generators:
110 V and 12 V System:
Problems Inside Boat:
Problems Outside the Boat:
Wish List:
Water Therapy Check On/Off Sheet Received:
Pre- Trip: -
Post Trip: -
*NEW* Check ON/OFF List
We are only noting what is different/doesn’t add up…
Water Therapy Propeller Inventory:
Boarding: Returning:
#1 Port
Port Skeg
#1 Starboard
Starboard Skeg
#2 Port
#2 Starboard
#3 Port
#3 Starboard